TRAFFIC ADVISORY
Temporary closures on N1 near Polokwane for essential power line installation
Pretoria, 28 November 2024 – The South African National Roads Agency SOC Limited (SANRAL) wishes to notify motorists of temporary closures on the N1 section 26, km 12.8 N/S near Polokwane in Limpopo Province.
The closure will affect the fast-lanes bi-directional (Northbound and Southbound) of the N1 to allow Eskom to install new overhead transmission power lines.
To ensure the safety of workers and motorists, traffic in both directions may be briefly halted for up to 30 minutes when cables are pulled across the road.
These closures will take place over five weekdays as indicated below.
| These closures will take place over five weekdays as indicated below. Dates | Starting Time | Ending Time | Area / Location | ||||
| Commence Date: | Monday, 2 December 2024 | 08h00 | 16h00 | Near Polokwane | |||
| End Date: | Friday, 6 December 2024 | 08h00 | 12h00 | Near Polokwane | |||
Local Traffic Officials will be on-site to manage traffic flow and minimise delays. Motorists are advised to:
- Plan their trips accordingly, allowing extra travel time, or consider alternate routes.
- Drive with caution, follow posted speed limits and be attentive to all signage and instructions from traffic officials.
- Check real-time traffic updates and road status information during these dates.
Weather conditions on the day may require adjustments to the lane closure schedule. Should any changes be necessary, SANRAL will issue updated information.
These essential fast lane closures will enable critical power infrastructure to be installed, enhancing service reliability in the area.
SANRAL urge motorists to be patient and cooperative throughout this period, as every effort is being made to ensure minimal disruption to their journeys.
Ends//
Press SANRAL Building on 30 Years of Democracy 2 years ago 0 210596 Press SANRAL ADVISES ROAD USERS OF CLOSURE ON R40 NATIONAL ROAD BETWEEN WHITE RIVER AND HAZYVIEW 12 months ago 0 80976 Press SANRAL announces new R2.2 billion project and Contractor Development Programme for N2 Wild Coast Road 1 year ago 0 66383 Press N14 circles in Kathu support industrial development in the Northern Cape 2 years ago 0 60229 Uncategorized UPDATED TRAFFIC ADVISORY: N3 road closure and rescue operations 1 year ago 0 59987 Press Temporary Lane Closures on N17-2, N12-19, N3-12 and R21 OR Tambo for Overhead Sign Replacement. 6 months ago 0 49573 Press N3 FULL ROAD CLOSURE NEAR MARKET ROAD, PIETERMARITZBURG FOR THE DEMOLITION OF THE EXISTING N3 MARKET ROAD OVERPASS BRIDGE 7 months ago 0 46809
