TRAFFIC ADVISORY
Switchover of traffic at N2 Thembalethu Bridge in George
Western Cape, 18 January 2024 – The switchover of all traffic from the eastern side to the newly constructed western side of the Thembalethu Bridge in George over the N2, is scheduled for either Thursday 18 or Friday 19 January 2024 between 11h00 and 13h00, the South African National Roads Agency SOC Limited (SANRAL) has announced.
“The exact date and time of the switchover – which affects vehicles and pedestrians – will depend on conditions on site, including the weather,” said Petronella Theron, SANRAL Project Manager.
Once all traffic is diverted onto the new road, construction activities will commence on the eastern side, where vehicles have been travelling up to this point.
There will only be one lane open to traffic in each direction.
“We appeal to road users to reduce speed in the construction area and to be patient. We have opted to execute the switchover outside of peak traffic times, to minimise the inconvenience to road users,” said Theron.
Press SANRAL Building on 30 Years of Democracy 2 years ago 0 210597 Press SANRAL ADVISES ROAD USERS OF CLOSURE ON R40 NATIONAL ROAD BETWEEN WHITE RIVER AND HAZYVIEW 12 months ago 0 80978 Press SANRAL announces new R2.2 billion project and Contractor Development Programme for N2 Wild Coast Road 1 year ago 0 66386 Press N14 circles in Kathu support industrial development in the Northern Cape 2 years ago 0 60229 Uncategorized UPDATED TRAFFIC ADVISORY: N3 road closure and rescue operations 1 year ago 0 59987 Press Temporary Lane Closures on N17-2, N12-19, N3-12 and R21 OR Tambo for Overhead Sign Replacement. 6 months ago 0 49574 Press N3 FULL ROAD CLOSURE NEAR MARKET ROAD, PIETERMARITZBURG FOR THE DEMOLITION OF THE EXISTING N3 MARKET ROAD OVERPASS BRIDGE 7 months ago 0 46810
