SANRAL recently awarded a project for the resurfacing of National Road R33, Section 6, from Mkhondo (km 0.0) to Amsterdam (km 36.0) in the Mpumalanga Province. This project aims to reduce the travelling times and ensure smooth riding quality with improved skid resistance. The high-level scope comprises site establishment, traffic accommodation, pre-treatment of existing road, edge-break repairs and construction of edge beams. Major work includes the base and surface patches, bridge joints repairs, seal construction and the painting of new road markings.
Other works to be undertaken are clearing and shaping of existing open drains, construction of subsoil drains where required and clearing of hydraulic structures and finishing off road reserves.
The economic benefit consists of the following:
- Targeted Labour: Minimum of 6% of the Final Contract Value.
- Targeted Enterprise: Minimum of 30% of the Final Contract Value.
The tender amount for the project was R91 million. The appointed consultant is Royal Mndawe Holdings (Pty) Ltd (also trading as ROMH) with Roadmac Surfacing (Pty) Ltd as the contractor. The Project Manager is Ms Palesa Monamodi, who can be contacted on 012 426 6200 or MonamodiP@nra-co-za-sanral.datafree.co SANRAL’s Northern Region Manager, Mr Hlahla, indicated that the R33 is an important strategic route, and this project will have positive economic spinoffs for the local economy. He further noted that preserving the current pavement aligns with SANRAL’s asset-preservation strategy, ensuring that national roads are kept at world-class standards. He stated that he looked forward to working with the community and the local authority to implement this project.
#End
Issued by FTI Consulting on behalf of the South African National Roads Agency SOC Limited (SANRAL) For editorial content or additional information please contact: pressoffice@nra-co-za-sanral.datafree.co
Press SANRAL Building on 30 Years of Democracy 2 years ago 0 210597 Press SANRAL ADVISES ROAD USERS OF CLOSURE ON R40 NATIONAL ROAD BETWEEN WHITE RIVER AND HAZYVIEW 12 months ago 0 80978 Press SANRAL announces new R2.2 billion project and Contractor Development Programme for N2 Wild Coast Road 1 year ago 0 66386 Press N14 circles in Kathu support industrial development in the Northern Cape 2 years ago 0 60230 Uncategorized UPDATED TRAFFIC ADVISORY: N3 road closure and rescue operations 1 year ago 0 59987 Press Temporary Lane Closures on N17-2, N12-19, N3-12 and R21 OR Tambo for Overhead Sign Replacement. 6 months ago 0 49574 Press N3 FULL ROAD CLOSURE NEAR MARKET ROAD, PIETERMARITZBURG FOR THE DEMOLITION OF THE EXISTING N3 MARKET ROAD OVERPASS BRIDGE 7 months ago 0 46810