TRAFFIC ADVISORY
Pavement Layer Repairs on the N1 Section 20 Northbound at km 41.0 – km 50.0
Pretoria, 10 July 2025 – The South African National Roads Agency SOC Limited (SANRAL) would like to notify road users that pavement layer repair works will be done on the N1national road section 20 at km 41.0 – km 50.0. The repairs will require the shifting of traffic on the Northbound carriageway (from Winnie Mandela Interchange to Buccleuch Interchange) from three slow lanes to two fast lanes. The traffic shift is currently planned to occur from 9am to 3pm on the 12th of July 2025 to the 24th of July 2025.
Alternative routes that can be taken include the Winnie Mandela Interchange / R511 as shown on the next page.
SANRAL urges road users to:
•Plan their trips accordingly.
•Adhere to the traffic accommodation signage and the flag persons advanced warnings, and
•Exercise patience and caution while navigating the affected area.
SANRAL apologises for any inconvenience caused and the roads agency remains committed to improving the safety and quality of our national roads.
N1-20, Pavement Layer Repair Northbound – Lane Closures – PROPOSED DETOUR ROUTES
Press SANRAL Building on 30 Years of Democracy 2 years ago 0 210596 Press SANRAL ADVISES ROAD USERS OF CLOSURE ON R40 NATIONAL ROAD BETWEEN WHITE RIVER AND HAZYVIEW 12 months ago 0 80976 Press SANRAL announces new R2.2 billion project and Contractor Development Programme for N2 Wild Coast Road 1 year ago 0 66383 Press N14 circles in Kathu support industrial development in the Northern Cape 2 years ago 0 60229 Uncategorized UPDATED TRAFFIC ADVISORY: N3 road closure and rescue operations 1 year ago 0 59987 Press Temporary Lane Closures on N17-2, N12-19, N3-12 and R21 OR Tambo for Overhead Sign Replacement. 6 months ago 0 49574 Press N3 FULL ROAD CLOSURE NEAR MARKET ROAD, PIETERMARITZBURG FOR THE DEMOLITION OF THE EXISTING N3 MARKET ROAD OVERPASS BRIDGE 7 months ago 0 46810

