TRAFFIC ADVISORY
N2 southbound closed over Umbongintwini River Bridge failure in KwaZulu-Natal
Durban, 5 November 2024 – Following the heavy rains this past weekend in parts of KwaZulu Natal, the Umbongintwini River Bridge on the N2 experienced a failure which resulted in road closure, the South African National Roads Agency SOC Limited (SANRAL) has announced.
“SANRAL specialist engineers are currently on site to assess the extent of the damage and remedial action to be taken. The Southbound carriageway over the bridge has been closed from Joiner Road and vehicles are being diverted to alternative routes. Motorists are advised to be cautious when approaching the site,” said Vusi Mona, SANRAL’s General Manager of Marketing and Communications.
Please click here to listen to GM: MarComms audio clip:
//Ends
Press SANRAL Building on 30 Years of Democracy 2 years ago 0 210596 Press SANRAL ADVISES ROAD USERS OF CLOSURE ON R40 NATIONAL ROAD BETWEEN WHITE RIVER AND HAZYVIEW 12 months ago 0 80978 Press SANRAL announces new R2.2 billion project and Contractor Development Programme for N2 Wild Coast Road 1 year ago 0 66383 Press N14 circles in Kathu support industrial development in the Northern Cape 2 years ago 0 60229 Uncategorized UPDATED TRAFFIC ADVISORY: N3 road closure and rescue operations 1 year ago 0 59987 Press Temporary Lane Closures on N17-2, N12-19, N3-12 and R21 OR Tambo for Overhead Sign Replacement. 6 months ago 0 49574 Press N3 FULL ROAD CLOSURE NEAR MARKET ROAD, PIETERMARITZBURG FOR THE DEMOLITION OF THE EXISTING N3 MARKET ROAD OVERPASS BRIDGE 7 months ago 0 46810
