TRAFFIC ADVISORY
Full closure of Alan Paton Avenue Southbound Carriageway between Blackburrow Road and N3
for the construction of the Epworth Underpass
Pietermaritzburg, 17 October 2024 – The Alan Paton Avenue Southbound Carriageway (onramp from Alan Paton Avenue to the N3 towards Durban) will be fully closed to traffic to facilitate roadworks as part of the N3 upgrade project between Gladys Manzi (Murray) Road and New England Road Interchange, the South African National Roads Agency SOC Limited (SANRAL) has announced.
This is a planned closure and will allow:
- The demolition of the existing N3 Epworth Underpass.
- The construction of the new N3 Epworth Underpass in a new location.
- The construction of the new Blackburrow Spruit Culvert.
- The construction of adjacent N3 and Alan Paton Avenue roadworks.
The closure will take place from 27 October 2024 to 27 November 2025, a period of approximately 11 months.
The Alan Paton Avenue Northbound carriageway (offramp from the N3 to Alan Paton Avenue/ Scottsville/Pietermaritzburg CBD) will remain open to traffic during this period.
“Our traffic accommodation team, with the assistance of the Road Traffic Inspectorate (RTI), will monitor the closure,” said Jason Lowe, SANRAL’s Eastern Region Project Manager.
Alternatives for access to the N3 Southbound carriageway (towards Durban) are via the New England Road and Market Road interchanges. A temporary access ramp will be provided for local traffic to access the N3 Southbound carriageway. It is also expected that the new link between Cleland Road and Market Interchange would be in place within six months from the Alan Paton Road Ramp Closure.
“Increased traffic volumes can be expected at the New England Road and Market Road interchanges, as well as the roads leading to them. These will lead to increased travel times, especially during the morning and afternoon peak hours. Motorists are urged to plan and adjust their routes ahead of time to minimise delays and remain patient during the closure. SANRAL apologises for any inconvenience caused and appreciates the public’s patience during the ongoing major road enhancements,” said Lowe.
//Ends
Press SANRAL Building on 30 Years of Democracy 2 years ago 0 210596 Press SANRAL ADVISES ROAD USERS OF CLOSURE ON R40 NATIONAL ROAD BETWEEN WHITE RIVER AND HAZYVIEW 12 months ago 0 80978 Press SANRAL announces new R2.2 billion project and Contractor Development Programme for N2 Wild Coast Road 1 year ago 0 66383 Press N14 circles in Kathu support industrial development in the Northern Cape 2 years ago 0 60229 Uncategorized UPDATED TRAFFIC ADVISORY: N3 road closure and rescue operations 1 year ago 0 59987 Press Temporary Lane Closures on N17-2, N12-19, N3-12 and R21 OR Tambo for Overhead Sign Replacement. 6 months ago 0 49574 Press N3 FULL ROAD CLOSURE NEAR MARKET ROAD, PIETERMARITZBURG FOR THE DEMOLITION OF THE EXISTING N3 MARKET ROAD OVERPASS BRIDGE 7 months ago 0 46810
