TRAFFIC ADVISORY
For lane closures on the N2 Section 11 from Linton Grange Interchange to St Albans Interchange
Eastern Cape, 18 March 2025 – The South African National Roads Agency SOC Limited (SANRAL) advises road users that lane closures will be implemented on the N2 Section 11, from the Linton Grange Interchange to St Albans Interchange, where the project is currently underway.
The effective date is from 15 March 2025 until 21 March 2025.
There will four lane closures within a 24-hour period from km 8.0 to km 12.8 on the East Bound slow lane, km 12.8 to km 8.0 on the West Bound slow lane, km 16.5 to km 19.5 on the East Bound fast lane and km 19.8 to km 16.6 West Bound fast lane.
Motorists can expect minimal delays, due to the required reduction in traveling speed to ensure safety.
Motorists can expect the movement of construction plant along the closures.
“The extensive scope of this project includes texture correction, rut corrections, in-situ recycling of base using bituminous emulsion, base patches, and resealing existing road surface. Although these activities may result in temporary inconveniences, the substantial long-term benefits primarily revolve around preserving infrastructure. The preservation and improvement of road infrastructure not only guarantees smoother travel experiences but also play a crucial role in enhancing the economic and social well-being of the community,” said Mbulelo Peterson, SANRAL Eastern Cape’s Provincial Head.
SANRAL appeals to motorists to adhere to the warning signs, to reduce speed when approaching the construction zones and to plan their trips accordingly.
SANRAL apologises for any inconvenience caused.
//Ends
Press SANRAL Building on 30 Years of Democracy 2 years ago 0 210596 Press SANRAL ADVISES ROAD USERS OF CLOSURE ON R40 NATIONAL ROAD BETWEEN WHITE RIVER AND HAZYVIEW 12 months ago 0 80976 Press SANRAL announces new R2.2 billion project and Contractor Development Programme for N2 Wild Coast Road 1 year ago 0 66383 Press N14 circles in Kathu support industrial development in the Northern Cape 2 years ago 0 60229 Uncategorized UPDATED TRAFFIC ADVISORY: N3 road closure and rescue operations 1 year ago 0 59987 Press Temporary Lane Closures on N17-2, N12-19, N3-12 and R21 OR Tambo for Overhead Sign Replacement. 6 months ago 0 49574 Press N3 FULL ROAD CLOSURE NEAR MARKET ROAD, PIETERMARITZBURG FOR THE DEMOLITION OF THE EXISTING N3 MARKET ROAD OVERPASS BRIDGE 7 months ago 0 46810
